Customization: | Available |
---|---|
After-sales Service: | Online Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
B3A Full Hydraulic Open Air Top Hammer Drilling Rig
B3A is a split open-pit DTH drill rig, which is widely used in mines and quarries all over the country. The drilling rig has simple structure, convenient maintenance, strong maneuverability, and is not sensitive to rock fissures. It is especially suitable for large-volume deep-hole drilling and quarrying operations. Its unique high-speed hydraulic motor-driven fan dust removal system is comparable to full hydraulic crawler drilling rigs, allowing operators to completely get rid of dust and at the same time effectively slowing down the wear and tear of the drilling rig's working mechanism.
Model | B3A |
Max drilling depth | 21 m |
Max drilling diameter | φ90-130 mm |
Rated power | 154 Kw |
Gradeability | 25 ° |
Max feeding stroke | 3700 mm |
Travel speed | 2.0-3.0 Km/h |
Transport dimension | 7800 x2400 x2900 mm |
Machine weight | 10500 kg |
Model | B3 |
Diesel engine | Cummins diesel engine |
Rated Power | 154 kw |
Diamter of hole | 80-115 mm |
Traveling speed | 1.5-3 km/h |
Drill Depth | 30 m |
Climbing ability | 25° |
FAD | 113.5 m3/min |
Compressor pressure | 16 bar |
Drill pipe | 68*3000mm, 76*3000mm |
DTH Impactor | 4", 4.5" |
Rotate speed | 0-100 r/min |
Swing torque | 2000 Nm |
Function | Automatic Change Rods sytem |
Dimension(L*W*H) | 6800*2600*2400 mm |
Weight | 9200 kg |
1. Simple operation
The intuitive control system adopts a combination of handles and buttons for operation. The cab has a wide field of vision, and the process of drilling, loading and unloading rods is clear at a glance, and the process is controllable.
2. Convenient maintenance
The layout of the tubing is reasonable, and each tubing in the reel is in the corresponding guide groove, which avoids the mutual friction between the tubing and improves the service life of the tubing. Both ends of the tubing and cable are equipped with marking rings for easy maintenance.
3. Economy
The engine meets the new emission requirements specified by Tier/Stage3. It integrates an air compressor and an automatic lever changer, and can be operated by a single person. The compact structure and high-efficiency system save fuel consumption compared to split machines.
1. How can I make payment?
A: You can pay directly online with credit card, or TT, Western Union, LC etc.
2. How long is the guarantee of your products?
A: We offer 6 months guarantee for machines and drilling tools, 1 year guarantee for equipment. For any problem occurs during guarantee, we will exchange new products or spare parts accordingly. We will still offer after sale service after the guarantee at very low cost.
3. How is the shipment? How long dose it take?
A: For large quantity or heavy products, we ship by sea shipping or land shipping. Shipping efficiency depends on country and city you want to ship to. For small and delicate products, we ship by DHL, UPS, Fedex or TNT. Air shipping is faster, generally speaking, Asian countries will take 3 to 5 days, other countries 7-15 days. You can also appoint shipping method you like before we ship.
4. How is your quality control?
A: We have our own experienced QC. There will be strict inspection and testing for every order before shipping out.
5. Do you have any certificate of authorization?
A: Our company have ISO certificate.Our machinery is CE certified, drill equipment have ISO9001 certificate.